Slatina – Croatia Infrastructure Project
Slatina infrastructure project contains 66km gravity corrugated pipelines, 57km PE pressure lines, 5.6km rehabilitation of the existing lines, 1.000m3 water tank construction, home connections, drainage lines, roads, walkways, bike ways and landscaping. The project is Fidic Redbook contract and the time line for the project is 33 Months.
Project is financed by European Union Funding and International bidding process has been concluded.
Interested!
Have a Look at Other Completed Projects
Ongoing Projects
Palm Residence Lagos – Nigeria
Landscaped courtyard, indoor and outdoor swimming pools, fitness room, infrastructure for a comfortable rest. The
Ongoing Projects
Emerald Hotel Radisson Collection Project – Nigeria
Radisson Collection is the Highest Segment of Luxury for Radisson Hotel Chain. Emeral Hotel Project
Ongoing Projects